![]() |
Three jeeps and a dozen men of the Third Division are ferried across the Rhine River by 540th Engineers on March 26, 1945 as two pontoon bridges are being constructed near Worms and Bobenheim. More than 1,000 vehicles were rafted over the river in 24 hours. DUKWs and DD flotation tanks also crossed the river in the assault. These ferries expedited the establishment of a ten-mile-wide and nine-mile deep bridgehead on the east bank securing the 7th Army bridges at Worms. |
![]() |
|||||||
|
|||||||||
Copyright © 2005 Tansy Publishing. All rights reserved. |
|||||||||